Skookumchuck Wind Project

The 136.8 MW Skookumchuck Wind Project is located on approximately 19,500 acres of land across Thurston and Lewis counties in the state of Washington, U.S.

Construction of the Project began in May of 2019, and the project reached commerical operations on November 7, 2020. The Project consists of 38 Vestas V-136 3.6 MW turbines.

Power produced by the Skookumchuck Wind Project is sold under a long-term Power Purchase Agreement to a single offtaker.

At a Glance

  • Location: Thurston and Lewis County, Washington, U.S.
  • Technology: 38 x Vestas wind turbines – 82 m hub height with a 136 m rotor diameter

Facts & Figures

  • Location: Thurston County & Lewis County, WA
  • Fuel: Wind
  • Capacity (MW): 136.8
  • Ownership: 49%
  • Operator: No
  • First on-stream: November 2020
  • Revenue Source: LTC
  • Builder: No
  • Contract Expiry: 2039